Kosy
logo_KOSYGROUP

People’s Committee of Bac Giang province to approve a detailed construction planning on Kosy urban area project, Bac Giang City, Bac Giang province (scale 1/500)

Date 21/09/2021

1. Location, boundary and scope of the project:

a- Location:

The planned area is located in Xuong Giang Commune, Bac Giang Province, about 1.5km from Bac Giang City to the North.

b- Design boundary:

– North: Rice field of Dong Gom Hamlet;

– South: Provincial Road 295B (Old National Highway 1A);

– East: Residential area in Trai Bac Hamlet, Xuong Giang Commune, Bac Giang City;

– West: Northeast belt road.

c- Scope of project: 23.3 ha.

d- Characteristics: This is a new urban area with main functions of housing, services, business, education, culture – sports and entertainment at urban level and some public works at urban and regional level.

                    

                                                          Overall perspective

2. Basic criteria of land use and technical infrastructure

a- Population: Its population is expected to be 3,200 people.

b- Land:

            – Land for villas: 250 – 400 m2/lot;

            – Land for adjacent houses: 75 – 110 m2/lot;

            – Apartment building and combined services: 80 – 150 m2 floor area/ household;

            – Land for construction of public works, services and trading: 4.5 m2/person;

            – Land for transport and car park: 28 m2/person;

            – Land for green trees and sports area: 10 m2/person

3. Land use structure

            – Land for housing                                          : 35.30%;   

            – Land for public works and urban services    : 6.90%;

            – Land for green trees and surface water                    : 15.39%;

            – Land for traffic and car park                                    : 42.41%

4. Method to organize landscaping space and architecture:

The whole urban space focuses on parks, lakes, high-rise buildings and villas, creating spatial core and low building density. Outer belt includes adjacent houses with high building density.

Construction works have high quality such as villas, public community houses, combined works mixing business and office.

Along the sub-zoned roads, the adjacent works are arranged. The works are built according to the design model.

5. Method to organize technical infrastructure network

KOSY new urban area in Xuong Giang commune, Bac Giang City, Bac Giang province is planned with convenient infrastructure system including traffic, electric, water supply and drainage, communication and environmental sanitation system; harmonious spatial organization and effective land fund utilization to ensure sustainable development of Bac Giang City.

Right after the planning was approved by the People’s Committee of Bac Giang province, Kosy province coordinated with the departments/ bureaus/ sections of Bac Giang province and the People’s Committee of Bac Giang City in promoting the next works, widely announcing to the public, managing the planning and completing investment procedures to commence the work.

 

Share: